Reports, Studies and Plans
More in this Section...
Asset Management Plan |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
View the Township's 2022 Core Asset Management Plan Update View the Township's 2014 Asset Management Plan The Asset Management Plan is for core infrastructure services such as water, wastewater, storm, roads and bridges. It provides reference for renewing, operating, maintaining, building, replacing and disposing of core infrastructure assets. The AMP relates to guidelines in the Ontario Ministry of Infrastructure's Building Together Guide for Municipal Asset Management Plans. View the Township's current Asset Management Policy Under the updated legislation of Ontario Regulation 588/17, Asset Management Planning for Municipal Infrastructure, municipal Councils are required to approve a Strategic Asset Management Policy. The Strategic Asset Management Policy is the first requirement in a staged process in order to comply with Ontario Regulation 588/17. This policy applies to all identifiable municipally owned infrastructure assets such as roads, sidewalks, bridges, water mains, sewers, fleet, buildings, Information Technology and parks. Assets will be evaluated based on their full lifecycle costs, including the costs of acquiring, operating, maintaining, renewing and disposal. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Conservation and Demand Management Plan |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
View the Township's Conservation and Demand Management Plan In accordance with the Electricity Act 1998, Ontario Regulation 507/18, broader public sector agencies within Ontario are required to develop an energy Conservation and Demand Management plan (CDM) and update every five years. A summary of the public agency’s annual energy consumption and greenhouse gas emissions for its operations must be provided. The CDM plan is to include a record of measures for conserving and reducing energy consumption by the public agency’s operations, and the results of these measures. The Township of Woolwich is prescribed as a public agency and is required to record and make public our annual energy consumption and CDM plan update. The Township’s updated plan was developed in compliance with the regulation and covers the period from 2020 to 2024. The plan was approved by Senior Management on June 25, 2019. The updated plan describes the Township’s:
The Township’s updated CDM plan builds on the municipality’s initial plan, developed in 2014, and the experience gained in energy conservation over the past five years. In addition to energy conservation, the updated CDM plan supports the Township’s Strategic Plan, Asset Management Plan, Annual Business plan and both the capital forecast and budget process. The Township dedicates funds in its annual capital budget to support a wide range of energy efficiencies, retrofits and equipment upgrades. Additionally, the Township has committed $50,000 annually to leverage additional funding from both provincial and federal grant programs to support energy efficiencies. Hard copies of the plan are available at the Township Administration Building located at 24 Church Street West, Elmira.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Corporate Business Plan |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
View the 2023 Corporate Business Plan The Township updates the Corporate Business Plan annually and aims to achieve the following:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Elmira Green Infrastructure Report |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The Elmira Green Infrastructure Report was prepared for the Township of Woolwich Environmental Enhancement Committee (TWEEC) by Natural Resource Solutions Inc. The Elmira Green Infrastructure Report was endorsed by Committee of the Whole on September 25, 2018 and Council at their meeting on October 2, 2018. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Emergency Plan |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
View the Township's Emergency Plan
Emergencies can happen at any time. The Emergency Plan sets out a plan of action to provide the earliest possible response. Community ExerciseThe plan is tested and updated annually through a community exercise. The exercise is design to do the following:
Declaration of an EmergencyThe Head of Council is responsible for declaring an emergency in order to:
Emergency Preparedness ProgramsPlease view the Emergency Preparedness Page. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Fire Master Plan |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Please view the Township's Fire Master Plan Recommendations. Appendix 1 - Maps
Appendix 2Appendix 3Appendix 4Appendix 5 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Official Plan |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The Township of Woolwich Official Plan consists of policies that govern land use for long-term growth. It is under regular review to make sure that it meets changing needs. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Strategic Plan |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
View the Township's new Strategic Plan
Why is it important?The plan will guide the Township into 2020. It acts as a tool to help determine key issues and forms a basis of actions while outlining focus areas to accomplish goals. What are the benefits?
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TransformWR: Waterloo Region's community-wide response to the global climate crisis |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TransformWR is Waterloo Region’s community-wide response to the global climate crisis. It outlines our long term strategy to achieve an 80% local greenhouse gas emission (GHG) reduction target, and identifies local actions needed to reduce our emissions by 30% by the year 2030. The TransformWR Plan outlines 6 transformative changes to guide the journey. For each Transformative Change, a set of strategies and action items have been identified, along with key milestones to help track our progress. The outcome of this collective action will lead to achieving our vision for 2050, and ultimately transform Waterloo Region into an equitable, prosperous, resilient low carbon community. All municipalities in Waterloo Region endorsed the plan in 2021. The TransformWR Plan was endorsed by Township of Woolwich Committee of the Whole on June 2, 2021 and at their That the Council of the Township of Woolwich, considering Report R07-2021 respecting TransformWR: Waterloo Region Community Climate Action Strategy:
Visit the Climate Action WR website for more information. |